Texas Instruments TDP142Q1-EVM Evaluation Module

Texas Instruments TDP142Q1-EVM Evaluation Module is used to test the performance of the TDP142-Q1 signal conditioning capabilities. The TDP142-Q1 is a linear DisplayPort™ 1.4 redriver capable of up to 8.1Gbps (HBR3).

The TI TDP142Q1-EVM Evaluation Module supplies I2C and GPIO control to configure the equalization of the redriver. Signal integrity can be tested utilizing the DisplayPort connectors on the TDP142Q1-EVM.

Features

  • DisplayPort 1.4 up to 8.1Gbps (HBR3)
  • Ultra-low-power architecture
  • Linear redriver with up to 12dB at 4.05GHz equalization
  • Transparent to DisplayPort link training
  • Configurable through GPIO or I2C
  • Supports DisplayPort dual-mode standard version 1.1 (AC-coupled HDMI)

Applications

  • Automotive head unit
  • Rear seat entertainment
  • Automotive infotainment and cluster
  • Active cables

Kit Contents

  • TDP142-Q1 device
  • Standard DP1.4 connector (source receptacle)
  • Standard DP1.4 connector (sink receptacle)
  • DC power regulators
  • I2C programming interface for external I2C host controllers
  • Standard 5V barrel jack receptacle
  • Headers for configuring various TDP142-Q1 features

Block Diagram

Block Diagram - Texas Instruments TDP142Q1-EVM Evaluation Module

Layout

Texas Instruments TDP142Q1-EVM Evaluation Module
Publicado: 2025-05-29 | Actualizado: 2025-06-04